April 20, 2026
Irene Ferrante
Seattle, WA 98109
Re: Continental House #606 AIIC Testing – Acoustical Services Fee Proposal
(#P26035)
Dear Ms. Ferrante:
Thank you for inviting us to propose our acoustical testing services your condominium project located in Seattle, Washington. It is our understanding that the project includes providing acoustical Impact Insulation Class (IIC) testing for your new home. Based on our understanding of the project, we are pleased to offer the following Scope of Services.
Scope of Services
PART 1: Mock-Up FIIC Testing
- Review the Continental House Condominium Association Hard Surface Flooring Policy related to the IIC rating requirements.
- Conduct a "mock-up" Apparent Impact Insulation Class (AIIC) test in general accordance with ASTM E1007, Standard Test Method for Field Measurement of Tapping Machine Impact Sound Transmission Through Floor-Ceiling Assemblies and Associated Support Structures.
- The mock-up flooring area shall be a minimum of 5'x5' and located centrally within the living room area.
- Any existing flooring must be removed so that the mock-up is placed directly on top of the subfloor (just as it would be installed as a finished floor).
- If adhesive is proposed for the final installation, adhesive must also be used for the mock-up flooring area.
- Depending on the size of the room, multiple mock-ups can be installed in the same room. In general, the mock-ups should be installed as close as possible to the center of the living room.
- Calculate the AIIC sound rating in accordance with ASTM E989, Standard Classification for Determination of Impact Insulation Class (IIC).
- Provide AIIC test reports in accordance with ASTM E1007.
Irene Ferrante, Continental House #606 AIIC Testing CENSEO Fee Proposal
April 20, 2026
PART 2: Post-Installation Test
- Conduct a post-installation Apparent Impact Insulation Class (AIIC) test in general accordance with ASTM E1007, Standard Test Method for Field Measurement of Tapping Machine Impact Sound Transmission Through Floor-Ceiling Assemblies and Associated Support Structures following the full installation of the proposed hard surface flooring.
- Calculate the FIIC sound rating in accordance with ASTM E989, Standard Classification for Determination of Impact Insulation Class (IIC).
- Provide an AIIC test report in accordance with ASTM E1007.
- The rooms/spaces on both sides of the floor/ceiling assembly should be unoccupied during the testing period.
- Simultaneous access to the test unit and unit located directly beneath the test unit is required for the duration of the testing period.
- The rooms on the receiver side of the floor/ceiling assembly should be fully enclosed (i.e., no open framing to adjacent spaces). However, the room finishes (i.e., carpet flooring, paint, acoustical wall panels) do not need to be installed at the time of the test.
- The test site must be very quiet in order to conduct an accurate test. It is preferred to conduct the tests at a time when noisy or construction activities are not occurring.
Meetings & Site Visits
| Meeting / Site Visit Description |
Location |
Qty. |
| Part 1: On-site Acoustical Testing |
Seattle |
1 |
| Part 2: On-site Acoustical Testing |
Seattle |
1 |
| TOTAL |
2 |
Compensation
We propose to provide the above Scope of Services for the following lump-sum fee, which includes all labor and non-labor expenses.
| Scope of Services |
CENSEO FEE |
| Part 1: Mock-up AIIC Testing |
$2,150 |
| Part 2: Post-Installation Testing |
$1,760 |
| TOTAL |
$3,910 |
Irene Ferrante, Continental House #606 AIIC Testing CENSEO Fee Proposal
April 20, 2026
Expiration
This fee proposal will be honored by CENSEO AV+Acoustics for a period of 90 days from the date of this proposal. After that time, we reserve the right to review and update our fees.
Assumptions & Exclusions
- We assume that testing for Mock-up testing can be conducted in one site visit and that Post-Installation testing can be conducted in one site visit.
- We assume that access to the residential units (above and below the test partition) will be provided and coordinated by others.
- Expert Witness Testimony and related preparation services are not included in the scope.
- We assume that the acquisition of materials and construction of any mock floor assemblies for field testing will be completed by others.
Optional Services
The following items are not included with the project but can be added for mutually agreed upon fees.
- Any meetings or site visits in addition to those listed in the above Scope of Services.
- Test preparation services, which includes any site visits to coordinate with the contractor installing the mock-up floor assembly.
- Any other service not specifically stated in the Scope of Services above.
Please let us know if you have any questions regarding this fee proposal.
Best Regards,
Jeanette Hesedahl
Jeanette Hesedahl, P.E., INCE Bd. Cert.
Senior Project Manager
CENSEO AV+Acoustics LLC
An NCAC Member Firm
Approved for Irene Ferrante by: