Policy Purpose:

Establish a policy that allows residents to install any type of flooring anywhere in their home, as long as the completed installation demonstrates a specified noise reduction level.

Policy Benefit:

Application:

The policy applies to any repair, replacement, or new installation of hard-surface flooring in any residential condominium at Continental House.

Definitions:

"Deposit" An amount equal to One Hundred Fifty percent (150%) of the cost of sound testing by a Board-approved Acoustic Consultant or $1,000, whichever is more.
"FIIC" Field Impact Isolation Class.
"Hard Surface
Flooring"
Any of a number of hard surface flooring materials, including but not limited to wood, tile, stone, granite, cement, or linoleum. All hard surface flooring, whether nailed, floating, or cemented to the sub-floor qualifies under this policy.
"New
Installation"
New installations or replacements of hard surface flooring materials in areas outside of the entry, kitchen, or bathroom, where not originally installed by the Developer, or over areas without hard surface flooring in the residence below.
"Plans" A combination of documents which demonstrate the type of hard surface flooring to be installed, the type of sound attenuating material to be used, a copy of the proposal from the contractor, a copy of the contractor's current license and bond, and a copy of the contractor's current insurance certificate.
"Repair" Replacement of less than 50% of the surface area of an existing installation in the residence's entry, kitchen or bathroom.
"Replacement" The replacement of an existing hard-surface installation in an entry, kitchen or bathroom only.
"Standard
Specification"
A combination of documents prepared by Michael Yantis Associates which demonstrates the minimum hard surface flooring installation criteria for replacement of an existing hard-surface installation in an entry, kitchen or bathroom.
"Underlayment" Any of a number of products such as foam, cork, and fluid coatings designed to dampen the transmission of impact noise between residences to a predetermined level.

Policy Elements:

The owner(s) requesting approval shall submit plans to the Board for approval prior to commencing work.

If the requested approval is for a repair, no further action is necessary. The Board may at its discretion monitor and inspect the installation as described below.

If the requested approval is for a replacement, the installation must use an underlayment which meets or exceeds the Association's attached "Standard Specification" and which meets or exceeds the minimum FIIC ratings below.

If the requested approval is for new installation, the installation must use an underlayment which meets or exceeds the minimum FIIC ratings below, and the owner shall comply with the following provisions:

Pre-installation and post-installation inspections shall be required for all hard surface flooring installations to assure that only Board-approved changes were made.

The Association is authorized to file suit against any owner who repairs, replaces, or newly installs hard surface flooring without following this procedure. The value of the suit will cover all costs, including legal fees.

Noise Compliance:

Replacement of hard flooring installations shall demonstrate compliance with an FIIC Rating of 55. New hard flooring installations shall demonstrate compliance with an FIIC Rating of 62. To account for test anomalies, the Board may grant a waiver for up to 3 dB difference between the measured levels and the criterion.

Following new installations of hard surface flooring, the Owner shall engage an Acoustic Consultant to conduct acoustic tests to verify that the installation is compliant with the established criteria. All Acoustical Consultant fees shall be paid by the Owner.

The Owner shall submit a copy of the Acoustical Consultant's test results to the Board. If the hard surface flooring installation fails to meet the minimum FIIC rating, the owner shall be responsible to correct the installation deficiencies and retest at their expense.

The Board may act to assure compliance after the installation time period is exceeded. The owner may request an extension if good faith efforts to complete a compliant floor installation are in evidence.