Continental House Condominium · Floor Impact Testing

Tap Test
Continental House

Bamboo Flooring Installation Impact Sound Documentation Seattle
Overview

This page documents the tap test process and flooring installation at Continental House Condominium. A standardized tap test machine was used to measure impact sound transmission through the floor assembly.

The installation includes Teragren bamboo flooring over RB Rubber Products 3/8" soft natural rubber underlayment, laid over the existing concrete subfloor.

Building
Continental House
Flooring
Teragren Bamboo
Underlayment
RB 3/8" Soft Natural
Phase 01

Concrete Subfloor Preparation

A liquid material was poured on that levels & hardens to create a flat surface.

Liquid leveling compound poured to create flat surface

FIG 01 — Liquid leveling compound applied to subfloor

Phase 02

Rubber Underlayment

Our underlayment — RB Rubber Products 3/8" Soft Natural rubber, providing impact sound isolation beneath the bamboo floor.

Rolls of rubber underlayment staged RB Rubber Products label detail

FIG 04–05 — Our underlayment: rolls staged and product specification label

RB Rubber Products

SKU: 31Q48A002500

Lag 9.5mm — 3/8" Soft Natural · 48" × 25' · Made in USA · www.rbrubber.com

Phase 03

Tap Test Setup & Device

Pre tap test set up — flooring and underlayment in place before testing begins.

Pre tap test setup

FIG 02 — Pre tap test set up

The tapping device — a standardized machine that generates controlled impact noise to measure sound transmission through the floor assembly to the unit below.

Tapping device on bamboo flooring

FIG 03 — Tapping device

Note: The tapping machine applies a series of weighted hammer blows at a standardized rate. The rubber underlayment beneath the bamboo floor is the primary mechanism for reducing impact sound transmission (IIC rating) to the unit below.

Phase 04

Apartment Being Tested

Pulled back views of the apartment during the tap test — showing the full scope of the flooring installation across the living areas, kitchen, hallway, and entry.

Pulled back view of apartment being tested

FIG 06 — Pulled back view, main living area

Kitchen area during tap test Hallway view during tap test

FIG 07–08 — Kitchen and hallway, pulled back views

Entry area during tap test

FIG 09 — Entry area, pulled back view